Ciência_Iscte
Publicações
Descrição Detalhada da Publicação
An integrated scheduling method for AGV routing in automated container terminals
Título Revista
Computers and Industrial Engineering
Ano (publicação definitiva)
2018
Língua
Inglês
País
Reino Unido
Mais Informação
Web of Science®
Scopus
Google Scholar
Abstract/Resumo
The simultaneous scheduling of quay cranes (QCs), automated guided vehicles (AGVs), and yard cranes (YCs) in automated container terminals (ACTs) has been a critical problem. This paper proposes an integrated scheduling for handling equipment coordination and AGV routing. With the goal of minimising makespan, we set up a bi-level programming model. To solve the model, we investigate and compare the rolling horizon procedure (RHP) and Congestion Prevention Rule-based Bi-level Genetic Algorithm (CPR-BGA). It is shown that the CPR-BGA algorithm is highly effective for the integrated scheduling in ACTs. We conclude that the CPR-BGA is effective.
Agradecimentos/Acknowledgements
--
Palavras-chave
Automated container terminal,AGVs path planning,Container handling,Integrated scheduling
Classificação Fields of Science and Technology
- Engenharia Eletrotécnica, Eletrónica e Informática - Engenharia e Tecnologia
- Engenharia Mecânica - Engenharia e Tecnologia
Registos de financiamentos
| Referência de financiamento | Entidade Financiadora |
|---|---|
| UID/EEA/50008/2013 | Fundação para a Ciência e a Tecnologia |
English