Scientific journal paper Q1
An integrated scheduling method for AGV routing in automated container terminals
Yongsheng Yang (Yang, Y.); Meisu Zhong (Zhong, M.); Yasser Dessouky (Dessouky, Y.); Octavian Postolache (Postolache, O.);
Journal Title
Computers and Industrial Engineering
Year
2018
Language
English
Country
United Kingdom
More Information
Web of Science®

Times Cited: 12

(Last checked: 2020-09-22 15:46)

View record in Web of Science®


: 1.6
Scopus

Times Cited: 17

(Last checked: 2020-09-19 18:09)

View record in Scopus


: 1.8
Abstract
The simultaneous scheduling of quay cranes (QCs), automated guided vehicles (AGVs), and yard cranes (YCs) in automated container terminals (ACTs) has been a critical problem. This paper proposes an integrated scheduling for handling equipment coordination and AGV routing. With the goal of minimising makespan, we set up a bi-level programming model. To solve the model, we investigate and compare the rolling horizon procedure (RHP) and Congestion Prevention Rule-based Bi-level Genetic Algorithm (CPR-BGA). It is shown that the CPR-BGA algorithm is highly effective for the integrated scheduling in ACTs. We conclude that the CPR-BGA is effective.
Acknowledgements
--
Keywords
Automated container terminal,AGVs path planning,Container handling,Integrated scheduling
  • Electrical Engineering, Electronic Engineering, Information Engineering - Engineering and Technology
  • Mechanical Engineering - Engineering and Technology
Funding Records
Funding Reference Funding Entity
UID/EEA/50008/2013 Fundação para a Ciência e a Tecnologia