Exportar Publicação
A publicação pode ser exportada nos seguintes formatos: referência da APA (American Psychological Association), referência do IEEE (Institute of Electrical and Electronics Engineers), BibTeX e RIS.
Luo, G., Serrão, C., Liang, D. & Zhou, Y. (2023). A relevance-based Technology-Organisation-Environment model of Critical Success Factors for Digital Procurement Adoption in Chinese construction companies. Sustainability. 15 (16)
G. Luo et al., "A relevance-based Technology-Organisation-Environment model of Critical Success Factors for Digital Procurement Adoption in Chinese construction companies", in Sustainability, vol. 15, no. 16, 2023
@article{luo2023_1716302823613, author = "Luo, G. and Serrão, C. and Liang, D. and Zhou, Y.", title = "A relevance-based Technology-Organisation-Environment model of Critical Success Factors for Digital Procurement Adoption in Chinese construction companies", journal = "Sustainability", year = "2023", volume = "15", number = "16", doi = "10.3390/su151612260", url = "https://www.mdpi.com/journal/sustainability" }
TY - JOUR TI - A relevance-based Technology-Organisation-Environment model of Critical Success Factors for Digital Procurement Adoption in Chinese construction companies T2 - Sustainability VL - 15 IS - 16 AU - Luo, G. AU - Serrão, C. AU - Liang, D. AU - Zhou, Y. PY - 2023 SN - 2071-1050 DO - 10.3390/su151612260 UR - https://www.mdpi.com/journal/sustainability AB - With the emergence of digital transformation, there is an increasing need for Chinese construction companies to adopt digital procurement (D-procurement). However, there is a lack of theoretical foundation to guide and support the adoption practices. This study aims to fill the research gap through the provision of a model by grouping a set of relevance-based critical success factors (CSFs) into the Technology–Organisation–Environment (TOE) framework for D-procurement adoption success (DAS). A case study approach is applied in the research. We selected H Group as it is one of the most representative D-procurement cases in China. The study includes two parts. In the first part, a systematic literature review was conducted, and 17 CSFs were identified from 12 selected studies. By grouping the 17 CSFs into the TOE framework, we put forward a basic CSF–TOE model. In the second part, an in-depth interview was carried out in H Group, where the 17 selected experts were asked to rank the previously identified CSF. Based on their order of relevance, the 17 CSFs were re-organised in the basic CSF–TOE model, and a relevance-based CSF–TOE model was finally proposed. This study is vital for D-procurement adoption because most existing CSF studies are based on the literature and questionnaire surveys, and there is a lack of actual case studies. In addition, this study significantly contributes to the field of D-procurement adoption for construction companies by providing a theoretical framework for practice and a relevance-based CSF–TOE model for research. ER -