Ciência-IUL
Publicações
Descrição Detalhada da Publicação
Título Revista
International Journal of Industrial Engineering and Management (IJIEM)
Ano (publicação definitiva)
2013
Língua
Inglês
País
Sérvia
Mais Informação
Web of Science®
Esta publicação não está indexada na Web of Science®
Scopus
Google Scholar
Abstract/Resumo
The Court System is often criticized for not performing at its best. Cases take longer than expected.
Research based on the Theory of Constraints and logistics took place in order to overcome these
difficulties. The purpose of this paper is to identify reasons why civil cases do not flow through the
court system as expected, and to discuss ways to shorten lead-times in the court process. A
comparative analysis of two case studies, with six court departments and a representative sample of
299 civil summary cases is used. Two levels of analysis are performed: one considering the total
period of time a case remains in each activity, the second considering the delays in each activity. Data
is analysed using statistical computation. Findings show that although the judge staff and the judge
are the main constrains in the system, others may emerge if poorly managed. Recommendations to
shorten lead-times are provided.
Agradecimentos/Acknowledgements
--
Palavras-chave
Courts of law; Services; Theory of constraints; Time
Classificação Fields of Science and Technology
- Engenharia Civil - Engenharia e Tecnologia
- Engenharia Mecânica - Engenharia e Tecnologia
- Engenharia Química - Engenharia e Tecnologia
- Economia e Gestão - Ciências Sociais