Artigo em revista científica Q2
Sliming lead times in courts of law: a case study
Ana Martins (Martins, A.); José Crespo de Carvalho (Crespo de Carvalho, J.);
Título Revista
International Journal of Industrial Engineering and Management (IJIEM)
Ano (publicação definitiva)
2013
Língua
Inglês
País
Sérvia
Mais Informação
Web of Science®

Esta publicação não está indexada na Web of Science®

Scopus

N.º de citações: 3

(Última verificação: 2024-12-15 09:47)

Ver o registo na Scopus


: 0.2
Google Scholar

N.º de citações: 9

(Última verificação: 2024-11-07 06:05)

Ver o registo no Google Scholar

Abstract/Resumo
The Court System is often criticized for not performing at its best. Cases take longer than expected. Research based on the Theory of Constraints and logistics took place in order to overcome these difficulties. The purpose of this paper is to identify reasons why civil cases do not flow through the court system as expected, and to discuss ways to shorten lead-times in the court process. A comparative analysis of two case studies, with six court departments and a representative sample of 299 civil summary cases is used. Two levels of analysis are performed: one considering the total period of time a case remains in each activity, the second considering the delays in each activity. Data is analysed using statistical computation. Findings show that although the judge staff and the judge are the main constrains in the system, others may emerge if poorly managed. Recommendations to shorten lead-times are provided.
Agradecimentos/Acknowledgements
--
Palavras-chave
Courts of law; Services; Theory of constraints; Time
  • Engenharia Civil - Engenharia e Tecnologia
  • Engenharia Mecânica - Engenharia e Tecnologia
  • Engenharia Química - Engenharia e Tecnologia
  • Economia e Gestão - Ciências Sociais